mortar
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| mortar [2026/04/16 10:53] – [Notes] freth | mortar [2026/05/12 14:33] (current) – [Mortar] freth | ||
|---|---|---|---|
| Line 5: | Line 5: | ||
| However, one clay is 2kg and one heap of sand is 20kg. Knowing this we can calculate the total clay and heap of sand needed to make the amount of mortar we want. | However, one clay is 2kg and one heap of sand is 20kg. Knowing this we can calculate the total clay and heap of sand needed to make the amount of mortar we want. | ||
| - | The mortar recipe calls for: | + | A simplified way of representing it is this. |
| - | * 1kg of clay which is half of a full clay, or .5 | + | * 1kg of clay is half of a full clay (2kg), or .5, so we will use .5 (1/2) for our formula. |
| - | * 1kg of heap of sand which is one twentieth of a full heap of sand, or .05 | + | * 1kg of heap of sand is one twentieth of a full heap of sand (20kg), so we will use .05 (1/20th) for our formula. |
| - | Using these values we can calculate the number of full clay and full heap of sand required. | + | ^ Clay ^^ |
| + | ^ Value ^ Formula ^ | ||
| + | | Number | $\text{Number} = \text{Mortar Needed} \times | ||
| + | | Kg | $\text{Kg}=\text{Number}$ | | ||
| - | ===== Formulas ===== | + | ^ Heap of sand ^^ |
| + | ^ Value ^ Formula ^ | ||
| + | | Number | $\text{Number} | ||
| + | | Kg | $\text{Kg}=\text{Number}$ | | ||
| - | Prerequisites: | + | For example... |
| - | * Mortar is the amount of mortar | + | 2000 mortar |
| - | * Number is the calculated number | + | |
| - | * Kg is calculated | + | |
| - | * 1 is 1kg per ingredient. | + | |
| - | * .5 is a half a clay, which is 1kg or the recipe amount needed per mortar. | + | |
| - | * .05 is a twentieth of a heap of sand, which is 1kg or the recipe amount needed | + | |
| + | ===== Notes ===== | ||
| - | Clay: | + | Keep in mind that kg and volume are two different things. |
| - | + | ||
| - | $Number=Mortar*.5$\\ | + | |
| - | $Kg=Number * 1$ | + | |
| - | + | ||
| - | Heap of sand: | + | |
| - | + | ||
| - | $Number=Mortar*.05$\\ | + | |
| - | $Kg=Number * 1$ | + | |
| - | + | ||
| - | ===== Example ===== | + | |
| - | + | ||
| - | We need 2000 mortar | + | |
| - | + | ||
| - | Clay: | + | |
| - | + | ||
| - | * Number: | + | |
| - | * Kg: 2000 * 1kg = **2000kg of clay** needed | + | |
| - | + | ||
| - | Heap of sand: | + | |
| - | + | ||
| - | * Number: | + | |
| - | * Kg: 2000 * 1kg = **2000kg of heap of sand** needed | + | |
| - | + | ||
| - | ===== Notes ===== | + | |
| - | * One heap of sand is 18.75 volume in a bulk storage bin, but is 20kg in inventory. This can be confusing until you realize they are two separate values representing different aspects. | + | A bulk storage bin has a volume column. |
mortar.1776354822.txt.gz · Last modified: by freth
