mwar
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revision | |||
| mwar [2026/04/26 11:00] – [Prohibitive] freth | mwar [2026/04/26 11:02] (current) – [Prohibitive] freth | ||
|---|---|---|---|
| Line 141: | Line 141: | ||
| Action: Collapsing/ | Action: Collapsing/ | ||
| Cause: Being off-deed.\\ | Cause: Being off-deed.\\ | ||
| - | Fix: If a building in a cave is off-deed it has to have a tile between it and the nearest cave wall. If on deed you can build next to a cave wall and/or collapse tiles next to buildings. | + | Fix: If a building in a cave is off-deed it has to have a tile between it and the nearest cave wall. If on deed you can build next to a cave wall and/or collapse tiles next to buildings. |
mwar.txt · Last modified: by freth
